Coca Cola London

Undertaken with BWI London Projects team ad working with the client Coca Cola and the catering consultants Tricon we were pleased to complete a first floor installation of the highest standard in June 2014. Catering equipment installed was of the highest reputation including Ambach, Foster refrigerator, Hobart and Rational. This allows the discerning customers a great choice of freshly prepared food in the centre of the city and the caterers to have the best possible equipment to assist them. General fabrication by Fabs 4 and extraction canopies by Brittania complete the picture. Front of house specification was of the highest order and Shine selected Fabs 4 with Tricon’s approval to provide and install the units to everyones satisfaction in a challenging delivery and installation environment.