accreditation Admiral Insurance Ageas Bowl Aspire Project Team Awards Balfour Beatty Construction BIM BIM development officer Brent Council Business Procurement Standards Cambridge Carter Lauren Catering catering equipment Catering Equipment Suppliers Association catering facilities Catterick Garrison CDIS Centrica Certified Food Service Professional CESA CFSP Chapel 1877 commercial catering equipment Concept Building Deepcut Baracks Denzien Construction Distributor Ebbw Vale Hot Mill School education catering equipment education sector energy efficiency fit out Food Service Consultants foodservice Google Hampton by Hilton Help for Heroes Hepburn Associates Hilton Hotel HMP Winchester Hyginox Imperial Tobacco Insight Intoto Design kitchen maintenance LACA National Conference Leadbitter Construction Learning Zone Lendlease Ministry of Defence Mircrosoft MoD Morgan Sindall Network Rail Preventative Maintenance and Service RAF Headley Court RAF Marham refurbishment Roz Burgess Shine Shine Food Machinery Sir Robert McAlpine Skanska Skanska UK SNCO Sodexo Sunesis System Integration Project Wembey Willmott Dixon Works Development Project

EDF Energy Hinkley Point Power Station

Posted by Chris Hinton at 10:07 on 30 July 2018

Shine Food Machinery recently completed a full fit-out of the canteen area of the EDF Energy power station at Hinkley Point in Somerset.

 

As the UK’s largest producer of low-carbon electricity and the biggest electricity supplier to British businesses, EDF Energy required a quality canteen area which could serve their many staff.

 

Shine commenced the project in 2017 and were requested to produce all services drawings in Revit for what was to be a BIM installation. Full kitchen walk throughs were produced by Shine in house designers to enable the client to envisage the final installation. Laing O’Rourke, being the main contractor, targeted a nine week installation period and Shine were tasked to meet this deadline within the agreed budget

 

Matt Summers, Project Manager at Shine, oversaw the delivery of the £858,484.00 project, working closely with the client to ensure that all of their needs and requirements were met.

 

The Shine team were the manufacturers of the foodservices counters within the canteen which were complete with stone finishes, and also installed the cold rooms and remote refrigeration, as well as complete design and fit-out of the kitchen areas.

 

Using equipment from leading manufacturers, Shine installed Rational combi ovens, Ambach cooking suites, Fosters coldstores and cabinets, Meiko dishwashers, Halton canopies and EAIS shelving.

 

Matt said: “This was a great project for both myself and the Shine team to work on. We did hit a few manufacturing issues with turn around times being so tight, but to overcome this we targeted room handovers to other areas in order to release some pressure from our supply chain and to keep the project on time.By implementing this strategy, we were pleased to deliver the back of house kitchens weeks before the handover date, which was a real achievement, and finishing the entire project on time.”

hp

hp

View more photos on the gallery page.